WMJC Tower Rebuild




By the time I arrived the top section had already been removed and was on the ground.

The second section being unbolted.

C.E. Mike Glaser inspects the antenna still bolted to the old top tower section.

In this picture you can see the crane used to lift the sections of tower.

The temporary antenna mounted to the bottom tower section.

The new solid state becon monted at the top of the new upper tower section.

The new tower sections waiting to be installed.